I-74/U.S. 311 and N.C. 68 (Eastchester Drive) Interchange

Fast Facts

Project # U-5169
Type: Interchange improvements
Affected Counties: Guilford
Estimated Cost: $15,775,000

Description

The NCDOT plans to reconstruct the existing interchange and approaches of I-74/U.S. 311 and N.C. 68 (Eastchester Drive) in High Point.

In an effort to support unanticipated turning volumes in and around that area, the interchange will be upgraded to allow for improved traffic-carrying capacity and reduced congestion on Eastchester Drive and the I-74 ramps. Cypress Lane and Gordon Road will also be realigned to improve the spacing and operation of the intersections.

Map

I-74

Project Schedule

  • Right-of-way acquisition – 2016
  • Start Construction – 2018
  • End Construction – 2020

Property Takings

More than 50 parcels of land will be affected by this project. Currently the NCDOT has set aside $3,397,000 for right-of-way takings. If your property will be affected, contact one of our eminent domain attorneys for a free case evaluation, or call 1-877-393-4990.

Get a free case
evaluation today.

There are only a handful of attorneys in NC who practice eminent domain exclusively, and even fewer with NCDOT experience. We have several. That’s why its worth getting in touch with us for a free case evaluation.

Here’s how it works:

1) Tell us about your situation.

2) We research your property as needed, using DOT maps, our own technology, and experience to see the exact effects.

3) We let you know what we think a fair offer would be. This evaluation is free, and there’s no
pressure or obligation to hire us after.

But please don’t wait to act. Waiting can hurt your case, and the cost is the same: free.

"*" indicates required fields

* Indicates required information

This field is for validation purposes and should be left unchanged.